Processing Authority: Special Equipment Supervising
Department of Shanghai Quality and Technical Supervision Bureau
Application Formality: I. Documents for
application 1. imported products (1) CIQ Notice; (2) Quality safety
permission certificated for import (copies); (3) Products quality
certificate; (4) Intension measurement of major pressure parts (5)
Displacement measurement of safety valve and bursting disc; (6) Finished
drawings 2. exported products (1) Permission of boiler and pressure
container manufacturing (copies); (2) Contract for goods; (3) Product
drawings;
Processing Procedures: 1. Processing authority to
examine the applying documents and accept the application. 2. Entrust for
appraising 1) after an initial examine of the applying documents, entrust
legal or authorized technical institutions to supervise and appraise; 2) the
entrusted technical institutions to issue testing notice to the applicant,
compile the supervising and appraising plan, and carry through the task; 3)
the technical institutions issue the Supervising and Appraising Report on
Imported (Exported) Boiler and Pressure Container. 3. Auditing and
certificating 1) Processing authority audits the Supervising and Appraising
Report on Imported (Exported) Boiler and Pressure Container. 2) Issue the
Supervising Certification on Imported (Exported) Boiler and Pressure
Container.
Charge Standard & Basis: 1. Standard: charge
according to the size of the equipment and the number of the testing
items. 2. Basis: Notice on Verifying Administration Charging Items and
Standards of Shanghai Labor System by Shanghai Pricing Bureau and Shanghai
Finance Bureau (Hu Jia She [1992] No. 177)
Processing Address: Room 1005 (for boiler) / Room
1006 (for pressure container), No. 1227 Chang-Le Road
Processing Basis: 1. Law on Import and Export
Commodity Inspection of the People's Republic of China 2. Regulations on
Supervising Imported and Exported Boiler and Pressure Container of the People's
Republic of China
Contact Tel: 54049194(boiler)、54046131(pressure
container)
Processing Time: Tuesday and Thursday
8:30-16:30
Time Limit for Processing: No more than 30 working days
from accepting the application to issuing the certificate (restructuring time is
not included)
Qualified Application Subject: in charge of safety
performance supervision of imported and exported boiler and pressure container
products, and issue the Supervising Certification on Imported (Exported) Boiler
and Pressure Container within Shanghai district.
|