Execution authority: Construction Examination Division, Key Project Division,
Danger Management Division and Water Supervision Station of Fire Supervision
Department of Shanghai Fire Bureau£¬and Fire Supervision Divisions (Sections) of
district/county Public Security (Branch) Bureaus
Arrangement of project examinations
(I) Projects to be examined by Construction Examination Division of
Fire Supervision Department of Shanghai Fire Bureau 1. Design of fire system
of the construction project planned by municipal planning bureau and the key
municipal construction projects; 2. High public buildings of first type (or
the high public buildings over 100 meters in Pudong New District); 3. The
resident building over 100 meters high or with the average construction area of
every household more than 150 square meters; 4. The Type-one
commercial-resident building with the store at bottom at least two floors
high; 5. Type C, D and E industry projects with the total investment more
than 300 million yuan; 6. Type A and B warehouse with the construction area
of single buidling more than 1 thousand square meters; Type A and B workshop
building with the construction area of single building more than 2 thousand
square meters; 7. Gas or liquid storage vessel independently built and with
the fire risk over Type C (excluding Type C); 8. New municipal construction
projects of subway, tunnel, railway station, wharf and airport; (II)
The projects to be treated as one of municipal key fire protection focuses other
than above shall be examined by Key Project Division and Danger Management
Division of Fire Supervision Department of Shanghai Fire Bureau; the gas station
or petrol station for automobiles shall be examined by Danger Management
Division of municipal Fire Bureau; the ships, wharfs and water-related
operations shall be examined by Water Supervision Station of Fire Supervision
Department of Shanghai Fire Bureau. (III) Other projects shall be examined by
the Fire Supervision Divisions (Sections) of district/county Public Security
(Branch) Bureaus and the authority for public security authorized by Shanghai
Fire Bureau.
Application procedure: 1. Text of primary design (overview of project and
special chapters of fire protection design); 2. The full set of drawings
designed by the design institution; 3. Approval document issued by the senior
superintendent authority; 4. Approval document issued by the planning
authority; 5. The applicant shall submit the CDs containing the materials at
the reception window of Fire Bureau, but CDs are not compulsory for following
projects: (1) Common public buildings with at most 3 stories high and
the most construction area of every story not more than 200 square meters,
except public entertainment places; (2) Common resident buildings at
most 6 stories high, except villa and garage; (3) Type C workshop
building or warehouse with the construction area of single building not more
than 400 square meters; Type D and E workshop building or warehouse with the
construction area of single building not more than 1 thousand square
meters; (4) Auxiliary facilities (including the transformation and
distribution rooms, boiler rooms, gas pressure regulating station or cabinet,
bus station, duty room of guards, external wall and awnings); Execution
procedure: After examining the application documents, the authorities for public
security and fire protection shall issue the "Comments on Design Examination of
Fire System of Construction Project (Primary Design Period)". Standard and
basis of charge: free Submitted to: Shanghai Public Security Bureau and Fire
Bureau Execution address: Construction Examination Division, Key Project
Division, Danger Management Division and Water Supervision Station of Fire
Supervision Department of Shanghai Fire Bureau
Basis of execution: "Law of the People's Republic of China on Fire
Protection", "Regulations of Shanghai on Fire Protection" and "Regulations on
Supervision and Management of Fire Protection of Construction
Projects". Contact phone: Please refer to "Execution
address" Website: Duration of service: Please refer to "Execution
address" Time limit: Since acceptance of application, the authorities for
public security and fire protection shall issue the "Comments on Design
Examination of Fire System of Construction Project (Primary Design Period)"
within 12-15 working days. Applicant's qualification: For the project of
building, expansion and rebuilding in Shanghai, the design of corresponding fire
protection facilities shall be examined. |