Home >> Service for Business >> Catastrophe Control >> Service Guide
Simplified Examination of Fire System of Construction Projects
(06/15/2005)
Execution authority: Shanghai Fire Bureau and Fire Supervision Divisions (Sections) of district/county Public Security (Branch) Bureaus shall take simplified examination of following construction projects within their respective authorities:
1. Common public buildings with at most 3 stories high and the most construction area of every story not more than 200 square meters, except the entertainment places; (note: the entertainment places refer to the singing and dancing hall, video room, night club, Kara OK room, games room and sauna room.)
2. Common resident buildings at most 9 stories high, except villa and garage and the buildings in a resident community with the floor area over 20 thousand square meters);
3. The Type C workshop building and warehouse with the building height lower than 24 meters and with the floor area not more than 1 thousand square meters; the Type D or E workshop building and warehouse (including stock yard) with the building height lower than 24 meters;
4. Auxiliary facilities (including the transformation and distribution rooms, boiler rooms, gas pressure regulating station or cabinet, bus station, duty room of guards, external wall and awnings);
5. Indoor upholstery of the office room, hotel room, apartment with hotel-like management, ward of hospital or sanatorium at single story (including standard story) with the original construction layout, functions and fire protection facilities unchanged.
Note: The simplified examination of fire system also can apply to the indoor upholstery project of the super high public building over 100 meters high. However, in this case, there must be one additional procedure: the owner or property management organization of the building shall apply to the superintendent authorities for public security and fire protection for simplified examination of fire system after indoor upholstery construction, the authorities for public security and fire protection shall send a consent reply and specify the unified standards, and the owner or property management organization shall affix the seal at the "Comment of original civil construction organization" box of "Shanghai Application Form for Simplified Examination of Design of Fire System for Indoor Upholstery Construction Project" and "Shanghai Commitment of Fire Safety for Construction Project".
6. Indoor upholstery construction of the teaching room of school with the original construction layout, functions and fire protection facilities unchanged.
Note: the "fire protection facilities unchanged" mentioned in item 5 and 6 refers to the change of fire system, namely, to be more specific, the change of type of automatic extinguishing system in construction, like replacement of automatic sprinkling system by gas extinguishing system, change of sprinkling pump, fire pump, integrated controller and interlinked controller of fire alarm system, anti-fume blower and change of water supply network for fire system. The moderate location adjustment of local sprinkler, fire detector, indoor fire hydrant box, smoke vent and air supply vent for indoor upholstery purpose shall be excluded.
7. The indoor upholstery construction with the original construction layout or functions changed and applied to any of the items 1-4 (except the entertainment places).
Application procedure: The construction organization shall submit "Shanghai Application Form for Simplified Examination of Design of Fire System for Indoor Upholstery Construction Project" and "Shanghai Commitment of Fire Safety for Construction Project" to the reception window.
Execution procedure: 1. When accepting the application documents, the staff shall check the documents on site. For the qualified, the staff shall create the registration information at the module of simplified examination and create the "Approval of Simplified Examination of Design of Fire System for *** Construction Project" (Attachment Two) or the "Approval of Simplified Examination of Design of Fire System for *** Indoor Upholstery Construction" (Attachment Three) on the official format paper and then issue the legal file of examination. For the unqualified, the staff shall return the application documents.
2. The internal job staff shall scan the drawings and documents of the construction project for simplified examination. Note: (1) If the "Comment of original civil construction organization" box of the "Shanghai Application Form for Simplified Examination of Design of Fire System for Indoor Upholstery Construction Project" and the "Shanghai Commitment of Fire Safety for Construction Project" cannot be filled in by the original civil construction organization for some reason, this box shall be filled in by the current owner or property management organization by affixing the seal. (2) To improve the condition that the detailed information of the construction organization cannot be printed out in a detailed and correct way because the words are limited by the space of box of the former unified format and to make the document more official, the format is adjusted as per the attachment sample and the applications shall be checked one by one.
Standard and basis of charge: free
Submitted to: Shanghai Public Security Bureau and Fire Bureau
Execution address: Construction Examination Division, Key Project Division, Danger Management Division and Water Supervision Station of Fire Supervision Department of Shanghai Fire Bureau
 
Basis of execution: "Law of the People's Republic of China on Fire Protection", "Regulations of Shanghai on Fire Protection" and "Regulations on Supervision and Management of Fire Protection of Construction Projects".
Contact phone: Please refer to "Execution address"
Website: 
Duration of service: Please refer to "Execution address"
Time limit: The qualified shall be settled on site.
Applicant's qualification: as required by the above items.