Home >> Service for Business >> Waters
Service Guide
The Confirmation of the Original Seawall After the New One is Built
The Checking of Harbor Areas, Planned Harbor Areas and Construction Along Coastlines
The Approval of the Development and Utilization of Sand Beach
The Checking and Approval of Construction on Important Riverway Dike
The Approval of Construction and Pilling Within The Controlled Area of Huang Pu River Flood Prevention Walls
The Approval of "Permit of Sand Collection In Riverway"
The Approval of Exemption and Reduction of Sand beach Use Fee
The Approval of Include Newly-built Dikes Into Coordinated Seawall Administration
The Approval of Sand Beach Reclamation Construction Acceptance
The Check and Approval of Construction on Flood Prevention Walls Along Huang PU River
The Registration and Filling of the Alteration of Protection Responsibility of Flood Prevention Walls along Huang Pu River
The Approval and Construction Acceptance Filing of Construction on Seawall Dikes
The Approval of the Use of public Seawall
Approval of Construction Projects That Affects Public Water Drainage System (Opinion fromUrban Planning Bureaus is Needed)
The Approval of Construction to Connect Self-constructed Water Drainage Facilities With Public Water Drainage System
Permit of Temporary Water Drainage (Construction)
The Approval of Drainage Pipeline Plugging
The Checking and Issuance of Water Drainage Permit (Permit on Temporary Water Drainage)
The Approval of Using Dyke or Embankment as Roads
The Approval of Activities Within Controlled Areas of Riverways
The Approval Installation and Expanding Sewage Systems Within River Ways
The Approval and Issuance of "Merit on the Temporary Use of Riverways"
The Approval of Filling of Rivers
The Filing of Construction Projects With Controlled Areas Along Rivers
The Approval of Water Quota Check (underground water)
The Approval of Water Supply Transfer
The Selection of Water Closet and Its Components of Enterprises With Water Quota
The Approval of Water Supply Construction Projects
Check and Approval for the Initial Application of "Permit on the Use of Ground Water"
Approval of Water Conservation Facilities Design in Technical Renovation Projects
Filing of Deep Well Digging Construction Qualification and Project Acceptance Inspection
Filing of Water Balance Testing
The Approval of the Connection Between Self-constructed Water Supply Network and Public Water Supply Network
Approval of the Temporary Termination of Water Supply and Reduction of Water Pressure
Approval of the Renovation, Relocation and Dismantling of Supply Facilities of Untreated Water and Public Water Supply
Filing of Water Conservation Projects
The Approval of Water Channel Protection and Construction Within Controlled Areas
The Approval and Issuance of "Permit on the Use of Underground Water"
Approval of Underground Water Use
The Registration and Testing of Cooling Tower
The Approval of Deep Well Digging (No Other Separate Approval)
FAQ
If I need to increase the capacity of my gas meter after installing a water heater with a capacity of over 10 liters, who pays for the new meter and the installation fee?
What to do if a gas cooker or water heater backfires?
Organizations
Shanghai Water Conservation Bureau