|
The Confirmation of the Original Seawall After the New One is Built
|
|
The Checking of Harbor Areas, Planned Harbor Areas and Construction Along Coastlines
|
|
The Approval of the Development and Utilization of Sand Beach
|
|
The Checking and Approval of Construction on Important Riverway Dike
|
|
The Approval of Construction and Pilling Within The Controlled Area of Huang Pu River Flood Prevention Walls
|
|
The Approval of "Permit of Sand Collection In Riverway"
|
|
The Approval of Exemption and Reduction of Sand beach Use Fee
|
|
The Approval of Include Newly-built Dikes Into Coordinated Seawall Administration
|
|
The Approval of Sand Beach Reclamation Construction Acceptance
|
|
The Check and Approval of Construction on Flood Prevention Walls Along Huang PU River
|
|
The Registration and Filling of the Alteration of Protection Responsibility of Flood Prevention Walls along Huang Pu River
|
|
The Approval and Construction Acceptance Filing of Construction on Seawall Dikes
|
|
The Approval of the Use of public Seawall
|
|
Approval of Construction Projects That Affects Public Water Drainage System (Opinion fromUrban Planning Bureaus is Needed)
|
|
The Approval of Construction to Connect Self-constructed Water Drainage Facilities With Public Water Drainage System
|
|
Permit of Temporary Water Drainage (Construction)
|
|
The Approval of Drainage Pipeline Plugging
|
|
The Checking and Issuance of Water Drainage Permit (Permit on Temporary Water Drainage)
|
|
The Approval of Using Dyke or Embankment as Roads
|
|
The Approval of Activities Within Controlled Areas of Riverways
|
|
The Approval Installation and Expanding Sewage Systems Within River Ways
|
|
The Approval and Issuance of "Merit on the Temporary Use of Riverways"
|
|
The Approval of Filling of Rivers
|
|
The Filing of Construction Projects With Controlled Areas Along Rivers
|
|
The Approval of Water Quota Check (underground water)
|
|
The Approval of Water Supply Transfer
|
|
The Selection of Water Closet and Its Components of Enterprises With Water Quota
|
|
The Approval of Water Supply Construction Projects
|
|
Check and Approval for the Initial Application of "Permit on the Use of Ground Water"
|
|
Approval of Water Conservation Facilities Design in Technical Renovation Projects
|
|
Filing of Deep Well Digging Construction Qualification and Project Acceptance Inspection
|
|
Filing of Water Balance Testing
|
|
The Approval of the Connection Between Self-constructed Water Supply Network and Public Water Supply Network
|
|
Approval of the Temporary Termination of Water Supply and Reduction of Water Pressure
|
|
Approval of the Renovation, Relocation and Dismantling of Supply Facilities of Untreated Water and Public Water Supply
|
|
Filing of Water Conservation Projects
|
|
The Approval of Water Channel Protection and Construction Within Controlled Areas
|
|
The Approval and Issuance of "Permit on the Use of Underground Water"
|
|
Approval of Underground Water Use
|
|
The Registration and Testing of Cooling Tower
|
|
The Approval of Deep Well Digging (No Other Separate Approval)
|