Responsible Departments: Shanghai Municipal Construction Standards
Administration Station Handling Procedure: £±. Application form. £².
Foreign or non-domestic technical regulations to be adopted (incluing the
approved Chinese version.) £³. Testing and inspection materials provided by
relevant departments. £´. Opinion from designing companies. Consulting opinion
from qualified local designing companies shall be provided if the project is
design by non-domestic or foreign designing companies.
According to: "Provisional Measures on the Adoption of Technical Regulations
from Foreign Counties, HKSAR, Macao SAR and Taiwan", (H.J.J. (99) No. 0086)
During of Procedure: Fifteen days after the receipt of the
application |