|
If a residence is not ready to undergo a full renovation, for the convenience
of room decoration or other reasons, one can apply for routing reconstruction in
advance at the network department of the district. For suburban residents, wire
pipes (PVC 6 models) may be routed during the redecoration, thus allowing for
new wires to be inserted when the residence is fully renovated in the future.
Since the installation of a duplex network requires high technology and
specific tools, a private installation may have a serious influence on the
network performance. Therefore, the cables and equipment used during such
renovations are not for sale on the market presently.
|