| A specific campaign to improve the rail traffic facilities and equipments
will be carried out by Shanghai Urban Transportion Bureau and subway operation
companies. To solve the problems caused by increased about of traffic to the
facilities and equipments, the two departments will deal with the most weaken
links, including, strengthening the inspection of fork roads, and key fork
roads, AC circuit, cpacity and switching, the inspection of telecommunication
power for the ground station of Line One and solve the problem of short circuit
on fork roads. Right now, the 130-square meter shopping area in the exchange
tunnel of Line One and Two has been demolished so that it's easier and faster
for passengers to go through.
|