| (I) About the Projects of Gas Production Structure Adjustment 1. Before
2003, reconstruct the 8 sets of heavy-oil gas production furnaces of Wusong Gas
Production Company by replacing the heavy-oil based production process with the
natural gas mode and the mixing process. Now 2 heavy-oil gas production furnaces
have been reconstructed. 2. Before 2003, Pudong Gas Plant shall be renewed
with the natural gas mode or the mixing process. (II) About the Projects of
Emergent Backup Gas Source 1. Accomplish the reconstruction of Shi Dongkou
Gas Plant before 2002, and develop the emergent production capability of natural
gas substitution in the volume of 1 million cubic meters per day. 2.
Accomplish the expansion of LNG Emergency Gas Resource Summit-Redeploying
Station before 2005, in order to meet the summit-redeploying need of the entry
of "Western-area Gas" into Shanghai. (III) About the launch of the entry of
"Western-area Gas" into Shanghai, and the full application of natural
gas Construct BaiHemen Natural Gas Station, 200km of hyper-pressure pipelines
of natural gas circling the city, 100km of downtown distribution pipelines of
natural gas, 12 high-pressure regulation stations of natural gas, enlarge the
emergency backup station of natural gas, reconstruct the artificial gas plant to
the mixing natural gas plant, and build 12 compressed natural gas stations (not
including the gas consumption projects such as chemical industry and electricity
generating). (IV) About the projects of technical progress Implement
modern operation and management to the gas industry, popularize the applications
of computer and other new technologies, promote the GIS of pipeline networks and
the application of SCADA system technology, improve the forecast accuracy, and
make the gas distribution in more rational way; accelerate the application of
safety gas facilities. (V) Detailed Construction Projects.
|